State of the Art Dallas Cowboys Stadium Receives State of the Art Ventilation Solution!

Arlington, Texas, USA 


Dallas Cowboys Stadium In the fall of 2009 the NFL’s Dallas Cowboys walked through the doors of their new stadium which is located in Arlington, TX.  The stadium regularly seats 80,000 fans however a vast standing room only area allows for the total occupancy level to reach 100,000.  As a result, this newly featured Cable TV Mega Structure has become the largest capacity stadium in the NFL.  

In addition to serving as the Cowboy’s home it is also a multi use facility.  It was designed to host events ranging from the NBA All Star Game, to Monster Truck Rallies and Main Event Boxing matches.  Both the stadium and food service operation needed to be efficient and versatile in order to adapt quickly with the change of venues.  The futuristic architectural design elements of the stadium would not accommodate a conventional kitchen ventilation system and the energy savings mandate provided for an even greater challenge to the foodservice design team.

Dallas Cowboys StadiumRicca Newmark Design, based out of Denver CO, with local support from their Texas branch, was chosen in the first round to tackle this project.  Soon into the design stages of the ventilation system it became very evident the normal game plan for routing ductwork would not apply.  The architectural mandate was for a smooth exterior roof line free of traditional ventilation systems and roof top units.  Structural features created ducting challenges due to support beams and height restrictions.  Based on his experiences, Sean Callnin of RND knew that there would be many challenges and coordination issues that a project of this magnitude would bring.  The window of opportunity to prepare full drawing sets in record time seemed to be only as long as it takes for the dome on the building to close.  As a result, Ricca Newmark Design had to select venders that they had confidence in and that would respond quickly.  One of the vendors selected was Halton and based on previous experiences, Sean knew that Halton could comply with all the product design criteria and had the experience with projects of this size to handle all the coordination requirements.  

M+E Engineers (Denver, CO) specified Halton’s EcoloAir to clean the kitchen exhaust air before entering the surrounding environment.  The city of Arlington granted a special ventilation variance when the combination of Halton Capture-Ray UV hoods and the EcoloAir unit were submitted.  The variance allowed for Type II ductwork to be installed downstream of the “EcoloAir discharge to the outside exhaust louvers, thus saving the owner, Blue Star Enterprises, many thousands of dollars. 

TD Industries, the mechanical contractor on the project was already familiar with Halton after working with Halton on the Arizona Cardinals Stadium.  The overall kitchen ventilation package consisted of Capture-Ray UV-C light exhaust hoods in combination with the EcoloAir three stage grease filtration units. There were numerous food venues that were required to accommodate a wide range of menu items and Halton is proud to have been invited to participate in the solution.


Provided Solution / Products:
34  EcoloAir Units
84 Capture Ray UV Exhaust Hoods 

 Halton EcoloAir
Halton EcoloAir™ units meet the increasingly stringent environmental demands and building regulations that have placed considerable limitations on the location of commercial kitchens. Odor control, smoke and the appearance of exterior exhaust ducts are all factors that need particularly careful consideration in foodservice environmental design. >> Read More
         
 Halton's Capture Ray UV
Many kitchens require emission control in their exhaust systems to comply with the increasing demand for environment-friendly operations. Halton's Capture Ray technology takes emission control and filtration efficiency to entirely new levels. >> Read More
         
 Halton Capture Jet
Halton Capture Jet hoods prevent the heat and impurities produced by cooking appliances from spreading to the work area. The hoods deliver a small air jet that pushes the uprising thermal current to the Halton KSA multi cyclone grease filters. Capture Jet hoods are 30 % more efficient due to their lower air flow rates, which adds up to direct savings in running and initial costs. >> Read More
         

Download Dallas Cowboys Stadium Reference sheet (pdf, 255 kB)

Reference Sheets

We have supplied products and systems for prestigious facilities all over the world, including luxury hotels, commercial restaurants, schools, hospitals, leisure parks, food courts and many, many others.

 

 Display/Show Kitchens 

> George Brown College, Toronto, Canada

 Educational Facilities


 

 Full Service Restaurants

> CN Tower, Horizon's Café,  Toronto, Canada

 HealthCare Facilities


 

 Hotel, Resorts & Casino's

> The Hotel Hershey, USA

 Quick Service Restaurants

> Chic-Fil-A, USA

 Stadium's

 > Dallas Cowboys Stadium, USA

 

 Global Projects

> Novotel, Paris, France
> Emirates Stadium, UK
> Nokka Restaurant,


Back | Print page